Spent all day rebuilding the heart of the veggie oil system – the valve assembly. It was removed 1 mile from this very spot, 1 year ago. However, if things continue to go as smoothly as they did today, we’ll be running on waste grease by tomorrow afternoon.I will post pictures of the process soon. But for the moment, here are an overall schematic of the system and a detail of the valve assembly I drew today. The design was made by Aaron and some of his friends out at SPAZ. It is a pretty complex system with on the order of 25 connections, and this does not include the heating system – so it’s not that surprising that we had some problems on the first try.
Oh, and thanks to Veerle for the great video tutorial on how to draw 3D pipes in Illustrator.

[...] first two photos here are the valve assembly that I diagrammed in an earlier post. In the first picture you see how I’ve disassembled it, in the second you see it put [...]